Controller NT538 AD

0,00 €
Price excluding taxes. Shipping costs calculated at the payment stage.
1CN0137
In stock

Unit based on an electronic microcontroller for the temperature monitoring of electric motors and MT -type MT/Type transformers, the NT538AD, thanks to the 8 input channels and the multiple programming options, offers great flexibility of use in many applications.

Developed with the layout and advantages of the new technological platform (double display, voting function, new microcontroller with operational capacity and increased data management), the NT538 AD provides the user, in a single product, outings:

  • Analog 4-20 my
  • Digital Modbus RS485

It is equipped with 8 entries for PT100 sensors and thanks to the versatility of the new 2016 edition, other sensor entries are available.

It is equipped with 5 Dry contact, Alarm and Trip, FAULT contact outlets for operating anomalies and control of the FAN1 and FAN2 cooling system.
On request, the unit is available with certification for Canadian and American markets Culus, as well as Rina for sea applications.

All our units can also be provided with a special coating on electronic cards, resistant to difficult climatic conditions, particularly characterized by high temperature and humidity (which are those of tropical climates).

Universal food: With entry from 24 to 240 Vac-DC.

Other versions
Unit NT538 Basic without any output such as analog or digital (cod. 1CN0156)

Options

  • Unit NT538 Basic EN50121-5 (Cod. 1CN0210)
  • NT538AD EN50121-5 (code 1CN0211)
Information on my delivery

Processing time if product in stock.
Orders are shipped in a working day.

  • A Order placed on Monday The Monday or the Tuesday.
  • A Order placed on Friday The Friday or the Monday.
  • A Order placed on Saturday will be shipped the Monday.

Processing time if product not in stock
If the products are not in stock the deadline is generally 1 to 2 weeks. We invite you to contact our salespeople to obtain the exact time.

Delivery times of our carriers
Relay point
: 3 to 5 days of transport.
Express: 1 to 2 days of transport.